#P01 · preview from current siteStone-effect mouldings for homes in London and the Home Counties
Stone-effect facades we design, make, fit and stand behind for decades.
We make every piece and put it on your wall: no finger-pointing between supplier and fitter. Survey £500 inc. VATCzy £500 to kwota brutto dla klienta prywatnego? Jeśli netto, na stronie musi stać £600 inc. VAT (CAP Code 3.18, zakaz ceny bez VAT dla konsumenta)., deducted from your order.
- 5-8 mmGrubość pokazujemy na przekroju P02-P03; po zdjęciu przekroju ToConfirm schodzi.of quartz coating
- 4,000Liczba wzorów w archiwum to słowa właściciela bez rejestru: potwierdzić albo wyciąć.profiles on file
- 1,500+Liczba klientów to słowa właściciela bez rejestru: potwierdzić z listy zleceń albo wyciąć.clients
- 5.0 from [N] reviewsZrzut profilu Google i liczba opinii. Poniżej 10 opinii to pole zmienia się na '3 design changes included'.on Google
#P19 Google review
#P19 Google review
#P19 Google review
Why it stays on the wall
- 01
A core that moves with the building
- 02
Mesh over the whole piece
- 03
5-8 mmGrubość pokazujemy na przekroju P02-P03; po zdjęciu przekroju ToConfirm schodzi. of quartz on a cement base
- 04
A dovetail lock and three adhesives
- Video needed#P04 Blowtorch held to the coating
Blowtorch
- Video needed#P05 Fitter standing on a window sill / cornice
Standing on it
- Video needed#P06 Hammer or ball hitting the coating
Ball test
What our clients say
- #P19 Google review
- #P19 Google review
- #P19 Google review
Drawn for one building. Yours.
What we make
- 01
#P07 · preview from current site#P07 Cornice detail on a finished elevation, closeCornices & string courses
Eaves cornices, string courses and covings, cut to your profile or matched to an original.
View details - 02
#P08 · preview from current site#P08 Window surround and sill, straight-onWindow surrounds & architraves
Frames for new openings, and replacements for originals that have worn away.
View details - 03
#P23 · preview from current site#P23 Sill and window head, straight-on detailSills & heads
Sills and window heads in the same profile as the surround, sized from the survey.
View details - 04
#P09 · preview from current site#P09 Portico / door surroundPorticos & door surrounds
The entrance, with options for lighting and a house-number plaque.
View details - 05
#P10 · preview from current site#P10 Column or pilaster with capitalColumns, pilasters & capitals
Full columns, flat pilasters and capitals, hollow where a steel post has to run through.
View details - 06
#P11 · preview from current site#P11 Quoins or panel cladding on a cornerQuoins, panels & bespoke
Corner stones, ashlar-style panels and any profile we draw from scratch.
View details
How a job runs
- 01
Site survey
£500 inc. VATCzy £500 to kwota brutto dla klienta prywatnego? Jeśli netto, na stronie musi stać £600 inc. VAT (CAP Code 3.18, zakaz ceny bez VAT dla konsumenta)., deducted from your order.
- 02
Design with three changes
We draw every element for your building.
- 03Photo needed#P13 Workshop in Kraków: moulding being coated
Made in our Kraków workshop
Cut, meshed, coated and locked.
- 04
#P12 · preview from current site#P12 Fitting team on scaffold with elements going upFitted by our own team
To your builder's sequence.
For architects and contractors
Balconies and upper storeys on structures never designed to carry stone.
- 01
A 300 kg balcony would weigh 10 tonnes in stone.Przykład z rozmowy 15.09: dla jakiego balkonu (wymiar)? Potwierdzić albo wyciąć.
- 02
The engineer's calculations come with the handover.
- 03
Drawings as DWG, DXF or PDF.
The guarantee, in plain terms
If our own team fits it, we answer for it.
Lifetime guarantee on the coating and the fixing, when fitted by our own team, with a paid inspection after 10 yearsZakres to definicja robocza, finalną piszemy razem z Wami: czy obejmuje też rdzeń, czy 'lifetime' liczy się od budynku czy od właściciela i czy przechodzi na kolejnego..
Questions before a survey
01What does the site survey buy me?
Our team on site: measurements of the whole building, photographs and a talk through what you want. A costed proposal follows. We charge for it because it takes two of our team, a van and London parkingZ rozmowy 20.09: tak uzasadniacie opłatę za survey (dwie osoby, auto, parking). Czy wolno tak napisać?, and the whole fee comes off your order.
02How long does it take?
Design and drawings come first, then production, then fitting. We give you the production time with the costed proposal. Fitting follows your builder's schedule, so we agree the dates with them.
03What about fire?
Watch the film first: in our workshop we hold a blowtorch to the coating. We don't quote a fire rating we can't back with a test certificate. If your project has a fire requirement, send us the spec and we'll tell you straight whether we can meet it.
04In a conservation area, or matching an original?
Matching is regular work for us. We take the profile from the original at the survey and match the colour to the stone beside it, weathering included. For a conservation area, the conservation officer at your council decides what is acceptable. We can supply drawings and a sample for the application.Wsparcie wniosku o zgodę nie wynika ze źródeł: potwierdzić, że to oferujemy.
Let us look at your building
Tell us the address and what you want to change, and we'll call back to agree a survey date. Survey £500 inc. VATCzy £500 to kwota brutto dla klienta prywatnego? Jeśli netto, na stronie musi stać £600 inc. VAT (CAP Code 3.18, zakaz ceny bez VAT dla konsumenta)., off your order.

